Indoor Climate Product info in PDF form
 

General Documentation  

Russian

Instructions, sizes 14-40

Air handling unit GOLD
GOLDSK04-80
Operation and maintenance instruction GOLD, program version 5.07, 08.10.08
GOLDIN04-80
Installation instruction GOLD RX/PX/CX, 15.05.08
GOLDINSD
Installation instruction GOLD SD, 15.05.08
Overview of the menu groups
User level, 08.10.08
ELRX1430
Wiring diagram GOLD RX, sizes 14-30, 15.05.06
ELRX3540
Wiring diagram GOLD RX, sizes 35-40, 15.05.06
ELPX1430
Wiring diagram GOLD PX, sizes 14-30, 15.05.06
ELCX3540
Wiring diagram GOLD CX, sizes 35-40, 15.05.06
ELSD1440
Wiring diagram GOLD SD, sizes 14-40, 04.11.08
ROTOR0460
Adjustment of the Inclination of Rotary Heat Exchangers, sizes 04-60, 31.10.08

Cooling unit CoolDX
CoolDX.INST
Installation and maintenance instruction CoolDX, 27.06.08
Commisioning record
In pdf-format, 081028

Communication
TBLZ41
Installation GOLDen Gate Lonworks FTT-10 (accessory), 15.10.07
LONfunk
Functional profile:
GOLDen GATE Lonworks FTT-10, Version 5.00, Version C, 29.08.07
EXOline
Protocol EXOline. Program version 1.05 and newer versions, 24.11.08
Metasys
Protocol Metasys N2 open. Program version 1.05 and newer versions, 24.11.08
Modbus
Protocol Modbus RTU/TCP Program version 1.05 and newer versions, 24.11.08

Trend
Protocol Trend Program version 1.05, 30.05.08

Function guides
AYC
Function guide All Year Comfort, 25.09.08
RECO2
Function guide ReCO2, 01.10.07
XZONE
Function guide Xzone, 11.07.08
PREFILTER
Function guide Prefilter, 10.07.07
PREHEAT
Function Preheating, 11.07.08
DEW
Function guide dew point regulation, 01.11.07
DEHUM
Function Dehumidification, 10.12.07



 


  

Accessories, GOLD
Adapter
Installation, cable adapter 32611101, GOLD SD, 30.10.06
ELQZ406
Installation, timer, ELQZ-1-406-1, 20.11.07
ELQZ455
Installation Instructions for the ELQZ-2-455-1-0/1, Push Button, 01.10.07
ELQZ504
Installation, air quality sensor, wall mounting, ELQZ-2-504, 01.10.07
ELQZ5042
Installation, air quality sensor, duct mounting, ELQZ-2-504, 01.10.07
ELQZ505
Installation, presence detector ELQZ-2-505, 01.10.07
FILTER1480
Installation, filter to GOLD SD 14-80, 15.12.06
MMC480
To upgrade the GOLD air handling unit by means of the MMC card, 04.10.07
TBBD
Installation mixing section TBBR to GOLD SD, 03.11.06
TBBR1480
Installation air recirculation section TBBR, 26.08.08
TBDA
Installation, silencer, TBDA, 10.12.08
TBFA
Installation, prefilter TBFA, 22.10.08
TBFK
Installation, carbon filter section TBFK, 07.02.08
TBHX
Installation roof hoods TBHA, TBHB, TBHC, 13.06.07
TBIQ2480
Installation Instructions for the TBIQ-2-1-aa IQnomic Plus Module, 12.11.07
TBKX
Installation, air cooler TBKA-3, 06.12.05
TBKX41440
Installation, air cooler TBKA-4 and TBKC, 28.10.08
TBLAmT
Installation, heater for hot water TBLA with Thermo Guard, 27.06.08
TBLAuT
Installation, heater for hot water TBLA without Thermo Guard, 27.06.08
ANVABATT
Connections for hot water reheating with GOLD 04-80, 23.06.08
TBLE
Installation electric air heater TBLE, 10.12.08
TBLF
Installation, air heater TBLF, preheater, 14.05.07
TBLZ13480
Installation extension cable kit TBLZ-13, 14.10.05
TBLZ23480
Installation Instructions for the TBLZ-1-23-aa, Pressure Transducer, 26.04.07
TBLZ2425
Installation, room sensor/outdoor sensor TBLZ-24/25, 14.06.05
TBLZ30
Installation, temperature sensor TBLZ-30, 22.06.05
TBLZ31
Installation, sensor, TBLZ-31, 02.1105
TBLZ32
Installation, temperature sensor, TBLZ-32, 07.11.24
TBLZ47
Installation, el. Timer TBLZ-1-47, 03.12.07
TBLZ481
Installation, Control Cubicle for Smoke Detection and Warning Function, ELQZ-1-48-1, 22.10.07
TBLZ482
Installation, Control Cubicle for Smoke Detection and Warning Function with Damper Exercise, ELQZ-1-48-2, 23.04.07
TBLZ49
Installation, Smoke Detector TBLZ-1-49-1, 15.10.07
TBLZ50
Installation, Zone Control Box TBLZ-1-50 (X zone), 22.08.08
TBLZ55
Installation, modular/terminal adaptor, TBLZ-1-55, 03.11.07
TBLZ56
Installation, Presence Detector TBLZ-1-56, 19.11.07
TBLZ58
Installation, internal temperature sensor, TBLZ-1-58, 23.04.08
TBLZ59
Installation, electrical equipment cubicle, TBLZ-1-59, 25.09.08
TBPA
Installation circulation pump TBPA, 01.10.07
TBSA
Installation damper TBSA, 10.12.08
TBTA0102
Installation casings for outdoor mounting of dampers/silencers TBTA-01/02, 19.10.06
TBTB480
Installation roof TBTB, 05.02.08
TBTBPX
Assembly, roof for outdoor mounting, TBTB, to AHU GOLD PX, 21.10.08
TBTBRX440
Assembly, roof for outdoor mounting, TBTB, to AHU GOLD RX sizes 04-40, 21.10.08
TBTB580SDCX
Assembly, roof for outdoor mounting, TBTB, to AHU GOLD RX 50-80, CX 35-80 and SD 04-80, 27.11.08
TBVA
Installation valve, set, TBVA, 10.12.08
TBXZ40
Installation water trap TBXZ-40, 06.10.08
TBXZ41
Installation, cover hood for pipework package, GOLD CX, TBXZ-41, 27.11.08
TBXZ42
Installation pipework package, GOLD SD, TBXZ-42, 27.11.06

 
   

Swegon Worldwide
Austria Belgium Czech Republic Denmark Finland France Germany Hungary Italy Netherlands
Norway Poland Slovak Republic Spain Sweden Switzerland United Arab Emirates United Kingdom United States of America
Partners
Belarus Bosnia-Herzegovina Croatia Estonia Greece Iceland Israel Latvia Lithuania Portugal
Romania Russia Serbia Slovenia - air handling units Turkey Ukraine