Produktblad inneklimat som PDF-fil
 

General Documentation  

German

Instructions, sizes 11-32

Air handling unit GOLD
GOLD SK
Operating and maintenance Instructions, 01.01.05
GOLDIN.11-15
Installation instruction, sizes 11-15, 01.01.05
GOLDIN.21-32
Installation instruction, sizes 21-32, 01.01.05
Overview of the menu groups
User level, 29.03.05

GOLDen GATE
TBLZ2112
Installation GOLDen GATE Serial EIA 485, TBLZ-1/2-1-2-41, 01.01.05
TBLZ3112
Installation GOLDen GATE Ethernet, TBLZ-1/2-1-3-41, 01.01.05
TBLZ4112
Installation GOLDen GATE Serial EIA 485, Trend, TBLZ-1/2-1-4-41, 01.01.05
GOLDen GATEConfig
Has been moved to the Software section.
EXOline
Protocole EXOline, 01.01.05
Metasys
Protocole Metasys N2 open Gateway, 24.10.06
Modbus
Protocole Modbus RTU/TCP Gateway, 01.01.05
Trend
Protocole Trend Gateway, 01.01.05

GOLD LON
TBLZ211
Instructions communication unit GOLD-LON for GOLD version B, 01.01.05
TBLZ111
Instructions communication unit GOLD-LON for GOLD version 4 and version A, TBLZ-1-1-1-41, 01.01.05
Gold lon 10.xif
XIF-fil (External Interface File). Describes the node functionality (right-hand click for download), 01.01.05

  

Accessories GOLD
ELQZ428
Installation, Smoke Detector ELQZ-2-428-2, 01.01.05
ELQZ504
Installation, air quality sensor, wall mounting, ELQZ-2-504, 01.01.05
ELQZ504-2
Installation, air quality sensor, duct mounting, ELQZ-2-504-2, 01.01.05
ELQZ505
Installation, presence detector ELQZ-2-505, 01.01.05
ELQZ-2-528-1
Installation, Control Cubicle for Smoke Detection and Warning Function with Damper Exercise, 01.01.05
ELQZ537
Installation, pressure transmitter ELQZ-1-537, 01.01.05
TBDA
Installation, silencer, TBDA, 01.01.05
TBKX
Installation, air cooler TBKA, TBKC, 01.01.05
TBLAuT
Installation, heater for hot water TBLA without Thermo Guard, 01.01.05
TBLAmT
Installation, heater for hot water TBLA with Thermo Guard, 01.01.05
ANVABATT
Connections for hot water reheating with GOLD, Version B, 01.01.05
TBLE
Installation electric air heater TBLE, 01.01.05
ANELBATT
Connections for the electric air heater with GOLD, Version B, 01.01.05
TBLZ07
Installation cover holding device, set, sizes 11-12, 01.01.05
TBPA
Installation circulation pump TBPA, 01.01.05
TBSA
Installation damper TBSA, 01.01.05
TBTAMONT
Assembly roof TBTA, 01.01.05
TBTA
Installation of the roof TBTA-1-XX, supply section TBTA-1-XX-1, extract air hood TBTA-1-XX-2, 01.01.05
TBVA
Installation valve, set, TBVA, 01.01.05
GIVARE
Installation Room sensor for wall mounting Outdoor/room sensor, 01.01.05

 
   

Swegon Worldwide
Austria Belgium Czech Republic Denmark Finland France Germany Hungary Italy Netherlands
Norway Poland Slovak Republic Spain Sweden Switzerland United Arab Emirates United Kingdom United States of America
Partners
Belarus Bosnia-Herzegovina Croatia Estonia Greece Iceland Israel Latvia Lithuania Portugal
Romania Russia Serbia Slovenia - air handling units Turkey Ukraine