|
Air handling unit GOLD GOLDSK04-80 Operation and maintenance instruction GOLD, program version 5.07, 08.10.08 GOLDIN04-80 Installation instruction GOLD RX/PX/CX, 15.05.08 GOLDINSD Installation instruction GOLD SD, 15.05.08 Overview of the menu groups User level, 08.10.08 ELRX5080 Wiring diagram GOLD RX, sizes 50-80, 15.05.06 ELCX5080 Wiring diagram GOLD CX, sizes 50-80, 15.05.06 ELSD5080 Wiring diagram GOLD SD, sizes 50-80, 12.04.07 ROTOR0460 Adjustment of the Inclination of Rotary Heat Exchangers, sizes 04-60, 31.10.08 ROTOR7080 Adjustment of the Inclination of Rotary Heat Exchangers, sizes 70-80, 31.10.08
Cooling unit CoolDX CoolDX.INST Installation and maintenance instruction CoolDX, 19.06.08
Communication TBLZ41 Installation GOLDen Gate Lonworks FTT-10 (accessory), 03.12.07 TBLZ441 Installation GOLDen Gate Trend (accessory), 16.02.06 LONfunk Functional profile: GOLDen GATE Lonworks FTT-10, Version 5.00, Version C, 29.08.07 EXOline Protocol EXOline. Program version 1.05 and newer versions, 04.06.07 Metasys Protocol Metasys N2 open. Program version 1.05 and newer versions, 04.06.07 Modbus Protocol Modbus RTU/TCP Program version 1.05 and newer versions, 04.06.07 Trend Protocol Trend Program version 1.05, 30.05.08 ModemIN Installation modem TBLZ, 26.09.05 webb Manual for web-page, 03.12.07
Function guides AYC Function guide All Year Comfort, 25.09.08 RECO2 Function guide ReCO2, 01.10.07 XZONE Function guide Xzone, 17.07.08 PREFILTER Function guide prefilter, 13.08.07 PREHEAT Function guide preheating, 17.07.08 DEW Function guide dew point regulation, 01.11.07 DEHUM Function Dehumidification, 17.12.07 |
|
Accessories, GOLD Adapter Installation, cable adapter 32611101, GOLD SD, 30.10.06 ELQZ406 Installation, timer, ELQZ-1-406-1, 03.12.07 ELQZ428 Installation, Smoke Detector ELQZ-428, 20.04.05 ELQZ455 Installation, Push button ELQZ-2-455, 08.10.07 ELQZ504 Installation, air quality sensor, wall mounting, ELQZ-2-504, 08.10.07 ELQZ5042 Installation, air quality sensor, duct mounting, ELQZ-2-504, 08.10.07 ELQZ505 Installation, presence detector ELQZ-2-505, 08.10.07 FILTER1480 Installation, filter to GOLD SD 14-80, 02.01.07 MMC480 To upgrade the GOLD air handling unit by means of the MMC card, 04.10.07 TBBD Installation mixing section TBBD to GOLD SD, 03.11.06 TBBR1480 Installation air recirculation section TBBR, 11.08.08 TBDA Installation, silencer, TBDA, 14.11.06 TBEK Installation, dual coil section TBEK, 25.03.08 TBFA Installation, prefilter TBFA, 27.10.08 TBFK Installation, carbon filter section TBFK, 07.02.08 TBIQ480 Installation Instructions for the TBIQ-1-1-aa IQnomic Plus Module, 18.08.06 TBIQ2480 Installation Instructions for the TBIQ-2-1-aa IQnomic Plus Module, 31.03.08 TBKA Installation, air cooler TBKA, 03.12.07 TBKC Installation, air cooler TBKC, 03.12.07 TBLA Installation, heater for hot water TBLA, 27.06.08 TBLE Installation, electric air heater TBLE, 25.03.08 TBLF Installation, air heater TBLF, preheater, 09.05.07 TBLK Installation, dual coil section TBLK, 27.06.08 ANVABATT Connections for hot water reheating with GOLD 04-80, 18.06.08 TBLZ13480 Installation extension cable kit TBLZ-13, 14.10.05 TBLZ23480 Installation Instructions for the TBLZ-1-23-aa, Pressure Transducer, 01.10.07 TBLZ2425 Installation, room sensor/outdoor sensor TBLZ-24/25, 14.06.05 TBLZ30 Installation, temperature sensor TBLZ-30, 14.06.05 TBLZ31 Installation, sensor, TBLZ-31, 07.11.05 TBLZ32 Installation, temperature sensor, TBLZ-32, 07.11.05 TBLZ47 Installation, el. Timer TBLZ-1-47, 03.12.07 TBLZ481 Installation, Control Cubicle for Smoke Detection and Warning Function, ELQZ-1-48-1, 24.10.07 TBLZ482 Installation, Control box for Smoke Function with Damper Exercising, TBLZ-1-48-2, 11.07.07 TBLZ49 Installation, Smoke Detector TBLZ-1-49-1, 15.10.07 TBLZ50 Installation, Zone Control Box TBLZ-1-50 (X zone), 11.08.08 TBLZ55 Installation, modular/terminal adaptor, TBLZ-1-55, 17.12.07 TBLZ56 Installation, Presence Detector TBLZ-1-56, 05.11.07 TBLZ58 Installation, internal temperature sensor, TBLZ-1-58, 18.04.08 TBLZ59 Installation, electrical equipment cubicle, TBLZ-1-59, 08.09.08 TBPA Installation circulation pump TBPA, 08.10.07 TBSA Installation damper TBSA, 09.07.07 TBTA0102 Installation casings for outdoor mounting of dampers/silencers TBTA-01/02, 19.10.06 TBTB480 Installation roof TBTB, 05.02.08 TBTB580SDCX Assembly, roof for outdoor mounting, TBTB, to AHU GOLD RX 50-80, CX 35-80 and SD 04-80, 21.10.08 TBVA Installation valve, set, TBVA, 17.07.08 TBXZ40 Installation water trap TBXZ-40, 24.10.08 TBXZ42 Installation pipework package, GOLD SD, TBXZ-42, 23.11.06
|